Skip to main content
Mayor of London logo London Assembly logo
Home

Climate-proofing social housing landscapes facts and figures

  • £450k

    The project's SuDS measures cost £450,000 to install

  • 0.3ha

    SuDS measures take water from 3,360m2 (0.3 hectares) of hard surfaces

  • 110m3

    The SuDS measures are designed to hold 110m3 of water