![Alma Road 2 2x1](/sites/default/files/styles/page_header_sm/public/alma_road_2_2x1.png?h=036f3151&itok=9L7Fkjd2)
Alma Road SuDS project
Key information
This page provides an overview of the Alma Road SuDS project, which directs rainwater from the highway into attractive rain gardens. The result is reduced highway flooding and cleaner water entering the drainage system.
Alma Road is a busy highway in Ponders End, Enfield.
It suffers from surface water flooding because of the large amount of grey, hard surfaces in the area (so rainwater isn't absorbed by the soil or by plants), and because the local drainage system doesn't have enough capacity to take lots of rainwater.
It also reduces the water quality of the River Lea. Rainwater picks up large amounts of pollutants from Alma Road before entering the road's gullies and feeding into the Brimsdown Ditch, which leads into the Salmon's Brook and then the River Lea.
This project was originally meant to create rain gardens along the stretch of Alma Road south of the Lea Valley Bridge. this would link into the SuDS features provided by the Alma Road Regeneration Scheme. However, developer Countryside has now included the highway and proposed rain gardens as a part of their development. Countryside has also committed to creating other SuDS measures throughout the regeneration area.
Countryside’s take-up of the rain gardens south of the bridge meant the project changed. It created five new rain gardens north of the bridge. The project aimed to:
- reduce surface water flood risk;
- encourage wider take-up of SuDS;
- improve the public realm; and
- make roads safer through the use of traffic calming measures.
The rain gardens are designed to accommodate the 1 in 5 year rainfall event. They have overflow pipes into the sewer network, to avoid overflow into the road in more severe events.
The rain gardens have been adopted and are maintained by Enfield Council’s Highways Services team. In the long term, the rain gardens will not be much more expensive to maintain than the original gullies.
Environmental improvements
Visits to the rain gardens after the June 2016 storms showed they'd coped well with heavy rainfall. They had also reduced the amount of water collecting in Alma Road. You can watch a video of the rain gardens at work on this webpage. The planting of the rain gardens has also attracted a range of insects, including bees.
Community engagement
An important part of the project was engaging students at nearby Alma Primary School with SuDS. Workshops were held with students, staff and locals, and the school has installed two rain-planters. There is also interest in installing more SuDS on the school site.
A mural for the Lea Valley Bridge was commissioned to leave a lasting educational legacy. Year 5 students created art work that was incorporated into the mural. They also helped paint the mural, together with Oasis Academy, HSBC corporate volunteers, and local people.
Wider take-up of SuDS
The Ponders End SuDS measures are setting an example for the wider uptake of SuDS in other developments across Enfield. For example, as a result of the Alma Road project, SuDS sessions were held with Enfield Council’s Transport team. Highways engineers are now using SuDS measures in their designs, including traffic calming schemes, footway renewals and 'greenway' cycle routes.
Speeding traffic
The speed bumps at Alma Road failed to reduce traffic speeds. This created dangerous conditions for the school. The speed bumps were removed and the rain gardens put in to reduce the speed of local traffic.
It has taken time for drivers to change their behaviour on this section of road. There was some damage to the rain garden kerbs in the first few weeks. However, drivers are now used to the change, especially after the road was re-marked. A comparison of current traffic speeds with a 2014 baseline will identify whether this calming measure has worked.
Sub-surface infrastructure
A National Grid medium-pressure gas main runs underneath one of the Alma Road rain gardens. However, the gas main was already waterproofed and so National Grid weren't worried by infiltration from the rain garden. Care was taken to avoid digging to the depth of the gas main.
Property ownership and status
Originally it was hoped the rain garden at the Alma Road / Scotland Green Road North junction would take rainwater from the roof of a nearby pub building, by disconnecting its downpipe. The owners of the building revealed that the pub was likely to be sold in the near future. However, the new owners now have the opportunity to divert rainwater from the roof into the raingarden in future.
Alma Road project photo gallery
Photos credit: Jamie Kukadia, London Borough of Enfield and Katherine Drayson
Alma Road rain gardens in action
Playing this video will set cookies from YouTube/Google
Alma Road facts and figures
-
£50k
The rain gardens cost £50,000 to install
-
133m2
The rain gardens cover an area of 133m2
-
37m3
The rain gardens are designed to hold 37m3 of water