Skip to main content
Mayor of London logo London Assembly logo
Home

Silvertown Tunnel

Key information

Date: Thursday 09th June 2022

Time: 09:00am

Motion detail

Siân Berry AM proposed, and Caroline Pidgeon MBE AM seconded the following motion:

“This Assembly notes that with the completion of Crossrail, the Silvertown Road Tunnel is now the single highest value transport project under construction in London.

This Assembly notes that Transport for London (TfL) has refused to provide modelling on the health, congestion and climate consequences of there being no road user charging at the Blackwall and Silvertown Road Tunnels after the Silvertown Road Tunnel is built.

This Assembly calls on the Mayor to instruct TfL to carry out this modelling and share the results with Assembly Members and residents of the areas affected.”

Following debate and upon being put to the vote, the motion in the name of Siân Berry AM was agreed, with 12 votes being cast in favour and 10 votes being cast against.

Response to motion

Motion responses June 2022 Mayor

Need a document on this page in an accessible format?

If you use assistive technology (such as a screen reader) and need a version of a PDF or other document on this page in a more accessible format, please get in touch via our online form and tell us which format you need.

It will also help us if you tell us which assistive technology you use. We’ll consider your request and get back to you in 5 working days.