Skip to main content
Mayor of London logo London Assembly logo
Home

ADD281 London Development Capacity Model - Strategic Housing Land Availability Assessment system upgrade

Key information

Decision type: Assistant Director

Reference code: ADD281

Date signed:

Decision by: Stewart Murray, Assistant Director of Planning

Executive summary

Approval is sought from the Assistant Director to spend up to £50,000 on the upgrade and enhancement of the Strategic Housing Land Availability Assessment (SHLAA) database to produce a multi-functional London Development Capacity Model (LDCM), while retaining the core functionality to calculate the housing targets for future iterations of the London Plan. The key objectives will be:

• To open it up so it can do more than a one-off snapshot, allowing multiple “projects”. These could be either London-wide or within other user-defined geographic areas.

• Custom upload of GIS boundaries to allow new constraint layers to be used in future SHLAAs without the need for a software developer and for project-specific spatial layers to be uploaded

• Editable constraint levels on all spatial layers

• Allocation of sites to uses other than residential and complex evaluation of mixed use sites

• Addition of specific capacity for specialist housing.

The resulting system will be capable of conducting integrated land availability assessments that cover additional land uses required to support housing growth. It can also be made available to the London Planning Authority’s (LPAs) to allow the ongoing management of their brownfield sites databases and to promote a consistent methodology for land availability assessments across London.

Signed decision document

ADD281 SHLAA upgrade 2015 (signed).pdf

Supporting documents

ADD281 SHLAA upgrade 2015 PDF.pdf

Need a document on this page in an accessible format?

If you use assistive technology (such as a screen reader) and need a version of a PDF or other document on this page in a more accessible format, please get in touch via our online form and tell us which format you need.

It will also help us if you tell us which assistive technology you use. We’ll consider your request and get back to you in 5 working days.