DD1275 Additional Physical Communication Link into City Hall

Key information

Decision type: Director

Reference code: DD1275

Date signed:

Decision by: Martin Clarke, Executive Director of Resources

Executive summary

In order to support the objectives of the Mayor and Assembly, most IT equipment (including all PCs, laptops and WiFi devices) in City Hall have access to the internet. Internet access is used for communication and research purposes as well as enabling access to a variety of business systems. Currently, the communication links which enable these services connect to City Hall via a purpose built service tunnel running from the west side of the MoreLondon estate. This service tunnel has been identified as a potential single point of failure with regards to IT services within City Hall.

Following an options appraisal and pre-market testing, it has been established that the most cost effective option to address this risk is to commission the installation of an additional fibre optic telecommunications cable to run into City Hall from the east side of the MoreLondon estate (thereby avoiding the service tunnel) up to a maximum expenditure of £80,000.

Decision

That the Executive Director of Resources approves expenditure of up to £80,000 (made up of £30,000 capital outlay in year one only and £10,000 per annum over a five year period for technical support and maintenance of an alternative physical communications line into City Hall for access to the internet.

Part 1: Non-confidential facts and advice

1.1 Currently all cabled communications links into City Hall enter the building via a purpose built service tunnel running across the west side of the MoreLondon estate. This service tunnel has been identified as a potential single point of failure with regard to IT operations within City Hall. Potential sources of failure could include fire, flood and structural failure where the building remains occupiable but the internet service becomes unavailable. The services that rely on these communication links are critical to the operation of City Hall.

1.2 Following an options assessment and pre-market testing, it has been established that the most cost effective option to address this risk is to commission a telecommunications company to install a new fibre optic cable along existing MoreLondon estate communication conduits running from Tooley Street, up Weavers Lane and then entering City Hall via a ventilation duct. It is proposed that a tender exercise following the GLA’s Contracts and Funding Code and procurement procedures are conducted in order to commission the required service and achieve value for money.

1.3 A specific cost estimate of £80,000 over 5 years made up of a £30,000 capital outlay and £10,000 per annum for 5 years for technical support and maintenance was obtained from BT following pre-market engagement in June 2014. This option is for the installation of a fibre optic cable allowing up to 1Gbit data communications.

• Implementation of an alternative physical communications link into City Hall for risk management purposes.

• Achieve best value

An equality impact assessment has been carried out. The proposals outlined in this report will result in additional network communications resiliency only and does not result in any changes in working practice or methods of service delivery. As a result no impact on any individuals with any protected characteristics has been identified as a result of the proposals outlined in this report.

4.1 Approval from More London estate is required for implementation work and access for support. Representatives of the More London estate landlord are included in this process.

4.2 This report addresses the GLA Business Plan 2014/15 to 2015/16 priority "Implement measures to strengthen business continuity of services at City Hall". This priority is addressed by working in partnership with TfL and thereby delivering cost savings.

5.1 The installation of an additional fibre optic telecommunication cable into City Hall and any associated infrastructure works is capital expenditure (£30,000) and will be met from the existing 2015-16 Technology Group capital budget.

5.2 Ongoing maintenance and support of the service, costing £10,000 per annum, will include resolving service disruptions, equipment failures, bandwidth monitoring etc. This annual costs will be contained within the existing TG budget.

5.3 Any changes to this proposal will be subject to further approval via the Authority’s decision-making process. All appropriate budget adjustments will be made.

5.4 Technology Group Unit within the Resources Directorate will be responsible for managing this project and ensuring that all associated expenditure adhere with the Authority’s Financial Regulations and Contracts & Funding Code.

6.1 The foregoing sections of this report indicate that:

6.1.1 The decisions requested of the Executive Director (in accordance with the GLA’s Contracts and Funding Code) fall within the GLA’s statutory powers to do such things considered to further or which are facilitative of, or conducive or incidental to the promotion of economic development, social and environmental improvement in Greater London. In formulating the proposals in respect of which a decision is sought officers have complied with the GLA’s related statutory duties to:

• Pay due regard to the principle that there should be equality of opportunity for all people;

• Consider how the proposals will promote the improvement of health of persons, health inequalities between persons and to contribute towards the achievement of sustainable development in the United Kingdom; and

• Consult with appropriate bodies.

6.2 All services required will be procured by Transport for London Procurement (who will determine the detail of the procurement strategy to be adopted) in accordance with the GLA’s Contracts and Funding Code. Officers must liaise with Transport for London Procurement in this regard.

6.3 Officers shall ensure that they liaise with legal Services in the preparation and execution of all contracts for services being procured.

• Procurement: Feb – March 2015
• Implementation: April 2015

Signed decision document

DD1275 Communication Link Internet (signed) PDF

Need a document on this page in an accessible format?

If you use assistive technology (such as a screen reader) and need a version of a PDF or other document on this page in a more accessible format, please get in touch via our online form and tell us which format you need.

It will also help us if you tell us which assistive technology you use. We’ll consider your request and get back to you in 5 working days.